Inspection Certificate Worksheet

An inspection before the balance payment is your leverage. This records who inspected, against which standard, and whether the goods passed - evidence you can point to later.

FAQ

When should I inspect?

Before you release the balance payment, while the goods are still at the factory. Once they are on the water, your leverage is gone.

What standard should I ask for?

For general consumer goods, an AQL sampling standard such as ISO 2859-1 with an agreed AQL level (2.5 is common). Agree it in the contract, not after production.